Home Design
288 posts on home design.
How does window placement help keep a home cool without relying on AC?
Window placement for natural cooling relies on cross ventilation:opposing openings, sliders, vertical windows and clerestories that cut your AC load.
· Read →What actually makes a window system “hurricane-resistant” beyond the glass?
A hurricane-resistant window system is more than glass:laminated panes, reinforced frames, real anchoring, and lonas or mallas on bigopenings.
· Read →How much cheaper are custom windows here than in the US?
Custom window prices, US vs Mexico: $2,000–$8,000 per windowstateside and $15,000+ for glass walls, versus a fraction of that here. Here's why.
· Read →What do the glass thickness options (3mm, 6mm, 9mm) actually mean for my home?
Window glass thickness options compared: 3mm for basics, 6mmfor thermal and sound gains, 9mm+ laminated for hurricane resistance and real quiet.
· Read →Aluminum vs. PVC windows — which is right for my home?
Aluminum vs PVC windows in a humid coastal climate: aluminumwins on cost and corrosion resistance, PVC wins on thermal insulation and ACsavings.
· Read →What structural engineering standard should my Playacar home actually be designedto?
The structural engineering standard for a Playacar home: ASCE 7design loads plus ASTM E1996 window testing, in both Phase I and Phase II alike.
· Read →How much extra time does Playacar’s HOA review actually add?
The Playacar HOA review timeline adds roughly two to four weeksto your front end, on top of — not in parallel with — municipal permitting.
· Read →What does Playacar’s HOA actually scrutinize — and does it differ by phase?
Playacar HOA design review differs by phase: beachfront setbacksand salt-air materials in Phase I, golf-course sightlines and height in Phase II.
· Read →Does hurricane season affect site drainage design differently by phase?
Site drainage design in Playacar changes by phase: Phase I needssurge-grade French drains and elevated floors, Phase II needs solid basics only.
· Read →What percentage of my budget should foundation work actually eat up in Playacar?
Foundation cost as a percentage of budget runs 12–18% onPlayacar Phase I beachfront lots and 8–12% on Phase II. Plan the gap before you buy
· Read →Why exactly do Phase I foundations cost 25–35% more than Phase II?
Phase I foundation cost in Playacar runs 25–35% above Phase IIbecause the tidal water table demands deeper footings, more rebar, and often piles.
· Read →
Can Americans and Canadians Build a House in Mexico? (Complete 2026 Guide)
Learn whether Americans and Canadians can build a house in Mexico, including fideicomiso rules, land ownership, construction permits, costs, and the building process.
· Read →