A remodel is a transformation, not a list of trades.
From the starting condition to the finished space — this beachfront condo shows what changes, and how.
A major remodel is best understood as a transformation, not a list of trades. This beachfront condo shows the change from the starting condition to the finished space.
What a major remodel actually requires.
Existing structures hide conditions that only surface once walls and finishes come out. A remodel that stays on budget depends on how well those surprises, and every decision after them, are coordinated.
- Assessment of hidden structural and mechanical conditions
- A realistic schedule built around occupied or adjacent units
- Documented selections and approvals before demolition
- Formal change control when conditions require a decision
Why "lowest price" is the wrong first question.
Avoid Contractor Scams: 5 Red Flags
Professional construction should have defined scope, documented decisions, payment discipline and accountability.
PlayaBuilder manages scope, approvals, reporting and changes from day one — so remodels don't rely on trust alone.
Two condos, one extra bedroom each, one week each.
Remodel cost, process and climate.
Answered by Aracely Guzmán, Director · Last reviewed Oct 2026
PlayaBuilder's condo and home remodels typically cost US$50–150 per sq ft (about US$540–1,615 per m²), depending on scope and finishes. For example, we've converted 19 condos at Luna Encantada from two bedrooms to three. One of them took one week, at a fixed price of US$9,800.
PlayaBuilder sets fees for each project individually, depending on its size, complexity and how much design work is involved. Either way, you get an itemized written budget before construction starts, and every change is priced and approved by you before the work is done.
On one project, a supplier sold us a refurbished pump as new. We caught it, and the supplier replaced it at no cost to the owner. Problems happen on every build; what matters is that you hear about them from us first, with the fix already in motion.
Salt air and humidity corrode metal, mildew finishes and wear out imported fixtures much faster than in the US or Canada. PlayaBuilder chooses materials for coastal conditions from the start, such as cement board instead of drywall in wet areas and marine-grade concrete below the water table.
Yes. Many PlayaBuilder clients live abroad and manage their build remotely, with scheduled progress reports, photos and decision points. The Casa Brisas owner lived outside Mexico for most of construction and approved every change remotely.
Have a remodel in mind?
Tell us about the space and what's not working — we'll help you understand what's involved before you commit.
Phone: +52 984 803 5014 · WhatsApp: +52 984 187 3579 · info@playabuilder.com